Bermad IR-420 Series Metal Hydraulically Operated Pressure Reducing Valve
by Bermad
PN: 420.00.02.G/A.I.BP.PCP
Original price
$544.40
-
Original price
$1,356.99
Original price
$544.40
$544.40
-
$1,356.99
Current price
$544.40
Bermad IR-420 Series Metal Hydraulically Operated Pressure Reducing Valve
DOWNLOAD PRODUCT BROCHURE |
The Bermad 420 pressure relief valve The Bermad model IR-420 pressure reducing valve is a hydraulically operated control valve. Its primary function is to reduce higher upstream pressure to align with a lower constant downstream pressure.
The Bermad 420 pressure reducing valve can either have two or three-way pilots fitted in order to achieve its purpose within an irrigation system. This article outlines the use of the three-way pilot control, which is often utilised in irrigation applications, such as the cherry orchard pictured below.
APPLICATIONS
- Pressure reduction in main line pipes from pump stations.
- Pressure reduction in field valves from regulation to drip, sprinklers or centre pivot irrigators.
FEATURES
-
Hydraulic Pressure Control
- Line pressure driven
- Protects downstream systems
-
Advanced Globe Hydro-Efficient Design
- Unobstructed flow path
- Single moving part
- High flow capacity
-
Fully Supported and Balanced Diaphragm
- Requires low actuation pressure
- Excellent low-flow regulation performance
- Progressively restrains valve closing
- Prevents diaphragm distortion
-
User-Friendly Design
- Easy pressure setting
- Simple in-line inspection and service
- Easy addition of control features
INSTALLATION
- Ensure enough space around the valve assembly for future maintenance and adjustments.
- Prior to valve installation, flush the pipeline to insure flow of clean fluid through the valve.
- For future maintenance, install Isolation gate valves upstream and downstream from Bermad control valve.
- Install the valve in the pipeline with the valve flow direction arrow in the actual flow direction.
- For best performance, it is recommended to install the valve horizontally and upright.
- After installation carefully inspect/correct any damaged accessories, piping, tubing, or fittings.